发现一款放水棋牌

News and information / news Your location: Website home page > News and information The right way to install cell access gate is shared.

Product list

PROUCTS LIST

The way to correctly install the gate access brake system

Release time: 2019-04-22 clicks: 1122 times
    Cell access gate brake First, we should wash a modern safety management system, which integrates microcomputer automatic identification technology and modern safety management measures. Access control system is used more in our life and work. But how much do you know about the installation of access control system? Let's share with you the contents of installation of access control gates.

   Cell access gate brake The installation methods are as follows:

1. Equipment installation

1, front-end equipment

A, install the card reader at the door. Do not approach or contact high frequency or strong magnetic field (such as heavy duty motor, monitor, etc.) in the sensing range of card reader, and cooperate with the grounding mode of control box.

B, install the exit button at the outdoors.

C and electromagnetic lock are installed on the upper edge of the door and door frame.

D, in order to ensure safety and aesthetics, the controller and power box can be installed or installed in the weak electric well. The advantage of installing the controller on the spot is to save the use of wire. The controller is installed in the weak electric well to facilitate the maintenance of the system and the safety of the system. The controller box can also be installed above the reader and close to the electromagnetic lock. Specific circumstances can be selected according to customer installation.

2. Central control room equipment

A, control host and keyboard are installed on facade walls or on worktables.

B and alarm devices are placed in a better alarm position.

C, due to the particularity of the access control system, the power supply of the system is good. It is recommended to use UPS power supply to centrally supply the gate system.

   Cell access gate brake Installation two: equipment commissioning

1, after the installation of the system is completed, the first access card reader signal is connected to the host computer, and then the condition of the access card reader is detected separately, whether there is any missing report or false positives. After testing this problem, it will be connected to another route. In this way, each path will be checked individually, and all the lines will be connected after confirmation.

2, management personnel can be authorized according to the permissions of the user, such as some personnel can enter or leave any place at any time, ordinary personnel can only enter the scope of authorization within the authorized time with the authorization card. When all access points are opened and opened illegally, check whether there is a record of the computer in the control center.

3, try the central computer because of failure or other reasons can not be connected to the controller, whether the controller can independently record the relevant information of the control points, when the central computer is connected, whether all information can be uploaded automatically, whether it can ensure the integrity of information records.

4, do a good job of debugging records.

5. Fill in the completion report afterwards.

   Cell access gate brake Installation three: pipeline installation

1, installation wiring should comply with the state regulations "electrical installation engineering construction and acceptance specification" and the relevant regulations and regulations issued by the state. Threading in pipes or grooves should be carried out after construction plastering and surface works. Before putting on the line, clean up the water and debris in the tube or line. Lines with different systems, voltage levels and current categories should not be worn in the same slot or slot. The conductor should not have joints or kinks in the pipe or groove. The joint of the conductor should be welded in the junction box or connected by terminals. The connection of small section system can be twisted, the number of turns should be above five turns, then tin is coated and wrapped with insulating tape. Where the pipeline passes through the deformation joint of the building, including the settlement joint, expansion joint and aseismic joint, compensation measures shall be taken. The two sides of the wire crossing the deformation joint should be fixed and appropriate allowance should be left. The terminals in the terminal box should be chosen to press the terminals or solder joints with tin solder joints, and the terminals should have a corresponding label.

2, access controller should be installed firmly, not tilted, and should be clearly marked. For light partition wall, reinforcement measures should be taken. The cables or wires with the access control controller shall be orderly and avoid crossing. The cables should be firmly securely fasten and the wires should be numbered and not easily discolored with the drawings. The terminals and the terminals must not be more than two wires. The cable cores and conductors should be kept not less than 20cm allowance; the wires should be bundled into bundles; after the wires are put into line, they should be blocked at the inlet line.

3. The main power supply line of access controller should be directly connected to the power supply. It is strictly forbidden to use power plugs. The main power supply should have obvious signs. The access controller is firmly grounded and has obvious signs.

4. The routing and specification of the ground bus in the monitoring room should meet the design requirements. The construction should comply with the following regulations: the surface of the ground bus bar should be intact, there is no obvious damage and residual flux residue, the copper belt bus bar is smooth, slippery and burr free, the insulation layer must not be aged and cracked; the ground bus bar should be placed in the middle of the geosyncline or cable walkway and fixed on the outside side of the frame slot; the bus bar should be leveled, and there must be no skew and bending. The connection between the bus bar and the rack or the roof should be firmly ended; the copper belt bus bar on the cable walkway can be fixed by screws; the copper stranded wire bus on the cable walkway should be tied up on the transverse gear; the system's lightning protection grounding installation should be strictly in accordance with the design requirements. Earthing installation should be carried out in conjunction with civil construction.

Online Service Contact information

Service hotline

0755-81796829

567彩票 下载 北斗棋牌全部版本 下载星云娱乐斗地主 中国福体育票开奖结果 3d172前后关系 乐彩3d论坛手机17500 鱼丸游戏街机奔驰宝马 3d试机号绕胆 2019斗地主怎么创建房间 中彩网投注为什么不花钱
Visit the mobile phone station Visit the mobile phone station
Visit mobile phone station